Naval Petroleum Reserve Remediation Environmental Support

Project Location

Bakersfield, CA

Project Date

2010

Project Tasks and Responsiblities

3e provided regulatory and technical support to ensure Department of Energy compliance with a Consent Agreement between DOE and the California Department of Toxic Substance Control (DTSC) for the Former Naval Petroleum Reserve No. 1 (NPR-1) in Elk Hills, CA.  To begin the project, 3e prepared a RCRA Facility Investigation (RFI) Work Plan for one Area of Concern (AOC), which included a Health and Safety Plan, Conceptual Site Model and Community Profile.   In addition, 3e prepared a Quality Assurance Project Plan (QAPP) for RFI activities at the Former NPR-1.  3e also prepared Strategy Documents for various AOCs which summarize previous investigations and provide recommendations for further investigation, remediation and/or release from Corrective Action.  3e reviewd field support contractor work products including Statements of Work, Sampling Plans and Work Plans.  3e prepared a Discussion Document to define the Hydrogeologic setting of the Elk Hills Reserve site which included the compilation of GIS layers and water quality and elevation data for area source wells and a programmatic approach for the evaluation for groundwater migration pathway for each AOC, as well as an Access database to track information on AOCs and deliverables for use by DOE.

EEE Consulting, Inc. ensures nondiscrimination in all programs and activities in accordance with Title VI of the Civil Rights Act of 1964.
If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Pam Rickman at (804) 442-3330 (TTY/TDD users, call 711).